| Taxonomy of methods | |||
---|---|---|---|---|
Visual Articles N = 8 [Methods N = 20] | Hypothesis testing Articles N = 11 [Methods N = 16] | Estimation Articles N = 15 [Methods N = 24] | Decision making probabilities Articles N = 10 [Methods N = 13] | |
Classification | n (%) | n (%) | n (%) | n (%) |
Type of event | ||||
 Prespecified | 0 (0) [0 (0)] | 5 (55.6) [7 (58.3)] | 0 (0) [0 (0)] | 4 (44.4) [5 (41.7)] |
 Emerging | 8 (22.9) [20 (32.8)] | 6 (17.1) [9 (14.8)] | 15 (42.9) [24 (39.3)] | 6 (17.1) [8 (13.1)] |
Time of analysis | ||||
 (Group) sequential | 0 (0) [0 (0)] | 5 (50.0) [6 (50.0)] | 0 (0) [0 (0)] | 5 (50.0) [6 (50.0)] |
 Final/one-analysis | 8 (23.5) [20 (32.8)] | 6 (17.6) [10 (16.4)] | 15 (44.1) [24 (37.5)] | 5 (14.7) [7 (11.5)] |