Skip to main content

Table 5 AUC of the simulation for factor 2: covariance of the difference values within each measurement method

From: Concordance rate of a four-quadrant plot for repeated measurements

   m=2     m=1  
  Proposal CCR Control1 Control2 Proposal Control1 Control2
ρ=0 0.965 0.937 0.937 0.946 0.941 0.895 0.924
ρ=1/3 0.968 0.939 0.939 0.949 0.947 0.889 0.921
ρ=2/3 0.972 0.937 0.937 0.946 0.948 0.880 0.916