Skip to main content

Table 6 AUC of the simulation for factor 3: covariance between X and Y

From: Concordance rate of a four-quadrant plot for repeated measurements

   m=2     m=1  
  Proposal CCR Control1 Control2 Proposal Control1 Control2
ρXY=0 0.965 0.937 0.937 0.946 0.941 0.895 0.924
ρXY=1/3 0.968 0.939 0.939 0.949 0.947 0.889 0.921