Figure 7From: Statistical process control of mortality series in the Australian and New Zealand Intensive Care Society (ANZICS) adult patient database: implications of the data generating process De-trended series (navy line) generating the GARCH (upper panel) and ARMA (lower panel) models with one-step-ahead forecast control limits (3SE); upper control limit (red line), lower control limit (green line). Back to article page